Mrida
ResTech

ResTech
Reverse engineered a heavy-tonnage machine housing from raw scan data, validating bearing bore concentricity and load-bearing mounting interfaces.


Heavy equipment contractor needed an exact replacement machine housing for a critical production line with no OEM drawing availability.
Cast steel housing was removed from machine with bearing races intact but mounting flanges showing operational wear.
Digitizing a high-mass casting with deep blind internal bearing pockets and precision gear pitch centers.
Combined optical photogrammetry with blue-laser tracking targets to maintain coordinate frame integrity over large envelope.
Extracted bearing pocket axes to 0.012mm tolerance, determined original interference fit, and modeled internal lubrication channels.
FEA stress review verified fatigue factor of safety under peak operational loads.
Turnkey CNC machining drawing package allowing a regional heavy engineering shop to machine a replacement.
Prevented weeks of costly production downtime by manufacturing replacement locally.
Bring us your component. We'll review feasibility under mutual NDA.